Secure, resilient OT networks for energy & industrial sites
Design, installation, and security uplift for renewable energy and critical infrastructure environments across APAC. Practical delivery: site installs, brownfield upgrades, firewall/VPN, segmentation, and SOCI-aligned monitoring readiness.
Services
Delivery-focused engagement for OT connectivity, security uplift, and monitoring readiness.
Site installs & upgrades
- Switch/router/firewall install & commissioning
- WAN circuits + backup links (cellular / failover)
- Cutover planning, rollback, validation
- Comms cabinet tidy-up, labelling, as-built pack
Small OT network design
- Segmentation (zones & conduits approach)
- IP plans, VLANs, routing, resiliency
- Vendor remote access models (practical & secure)
- Design + build packages with handover
Security & monitoring
- Firewall policy / NAT / VPN reviews
- Logging sources + SOC/SIEM readiness
- Baseline hardening for OT comms paths
- Evidence packs for audits / assurance
If you have a specific job (firewall replacement, site-to-core VPN, segmentation uplift), email a brief scope and I’ll propose a day-rate or fixed package.
Toolbox
Common platforms and patterns used in OT connectivity and secure operations.
SOCI uplift (not just “IT security”)
Practical uplift aligned to SOCI / CIRMP Rule 8 and AESCSF expectations — improving monitoring readiness and defensible evidence, without disrupting operations.
What good looks like
- Clear monitoring coverage and escalation paths
- Repeatable threat & anomaly handling
- Defensible artefacts: alerts, tickets, timelines, reports
- Controls that are “reasonably practicable” and auditable
Common deliverables
- Logging source inventory & coverage mapping
- Monitoring/alert baseline + tuning recommendations
- Site handover pack + as-built diagrams
- Simple evidence pack for assurance reviews
How to engage (fast)
Shortest path to a quote: send a tight scope. Use the checklist or the email builder below.
Best email to send
- Site / location and target dates
- What needs installing/designing (devices/brand)
- Access constraints + outage window
- Who signs off (EPC / O&M / owner)
Engagement types
- Short contract: 1–10 days (site install / cutover)
- Package: design + build + handover
- Remote support: review, planning, validation
- On-call burst: project peak / outage support
Email builder (opens your email client)
Base: Sydney, Australia • Coverage: All APAC (remote + site travel) • Email: info@orbitnetsec.com